Escroda
2019-02-03 23:38:44
- #1
Yes, but only concerning his trade. He will not request an excerpt from the land register to verify whether the encroachment of the clearance spaces might perhaps be secured at the neighbor’s.The district chimney master inspects fireplaces according to §73 BayBO.
If you now come up with bits and pieces of new facts all the time, no one can give you useful advice. I leave the entire parcel history analysis to your specialist lawyer for construction law.The outbuildings 2a and 2b have been boundary constructions since 1961/62 (location of the heating system)
No, but according to your previous descriptions, due to the change of use.Due to the subdivision of the property, there has been no loss of non-conforming use protection here.
I think, at that time it was still a parcel.Owner A converts his residential property and needs a permit for this. A only gets this if he asks Owner B whether he may demolish part of his residential property for it.
I think this is presented in the building application for the change of use.That is then agreed orally
Which objections?Objections expire
That’s what I’m saying. The subdivision has worsened the building law violations.With 1.5m distance to the current boundary, the outbuilding would not be secured under the clearance space regulations
It already lost it due to the change of use of the neighboring building.Because of this coercive measure, the building would lose its non-conforming use protection
Because it was a condition of the permit for the change of use.Why should the non-conforming use be eliminated?
Yes, but without a boundary. Or with one? Ah yes, the parcel history. Sorry, the factual situation is too complicated for a forum. Or for me. Although, Yvonne already dropped out in #6.But I don’t need a garage, rather an outbuilding, and it has been there since 1941.
You want 18m, 9m is permitted. You want deviations because of the legal violations by the previous owners? Good luck! Maybe I just don’t understand the situation. Discuss your project with the approval authority and share the outcome with the forum. Perhaps in the end with photos of a beautiful new building.isolated deviations from clearance spaces and a boundary construction dimension over 15m.