Is this secondary construction cost calculation realistic?

  • Erstellt am 2018-12-12 10:53:40

Golfi90

2019-01-15 18:50:52
  • #1
Is explained under the section Drainage.

However, the work is carried out by myself. So it is basically considered "only" as a buffer.
 

ypg

2019-01-15 19:59:16
  • #2


I don't see it in #20, but okay. If you say so...
 

Golfi90

2019-01-15 20:23:15
  • #3


I had probably called it a sewage connection.
 

ypg

2019-01-15 21:10:26
  • #4

That is something different.
 

Golfi90

2019-01-15 21:35:55
  • #5
The rainwater is also directed into a sewer system here.
 

Yaso2.0

2019-01-16 09:09:36
  • #6


The general contractor said that we don't have a rainwater shaft. The development plan states: The rainwater from the roof surfaces must infiltrate via near-natural infiltration systems, as long as it is not used as service water.

Or does it always have to be there??
 