Since this is probably a simplified approval procedure, as there is a development plan, the municipality does not review the documents in detail. The responsibility lies with the planner. They take responsibility for ensuring that all requirements of the [B-Planes] and the building regulations are met. If the municipality has approved the application and has not found all errors, this does not mean that all these points have been overlooked. After all, it's not like an Easter egg hunt.

To understand the neighbor's signature: In Bavaria, as in many other federal states, the neighbor's signature only serves to inform them about the construction project. So that they have been informed in the spirit of good neighborly relations. That is all. Your neighbor does not approve anything by signing!
 

DG

2014-05-26 17:51:04
  • #2


It may be even more complicated - if the garage is actually not approvable as it is currently planned, it may happen that due to the new situation, the simplified approval procedure no longer applies and a formal building application must be submitted. However, a neighborhood approval has already taken place here, meaning the municipality can hardly claim to be fundamentally unaware of the matter, so the planner is not solely at fault.

But this cannot be clarified without looking at the plans; you really have to take a close look at what was applied for and what is permissible.

Best regards
Dirk Grafe
 

Similar topics
05.10.2014Approval procedure for moving a house15
22.02.2016Signature of the work contract before financing?15
24.06.2017Construction ancillary costs: Bank requires signature from the architect16
30.08.2017Signature of prefabricated house under reservation with right of withdrawal16
17.11.2017Construction contract - What is regulated only after signing?10
27.03.2018Urge to sign due to price increase normal?50
18.07.2020TGA planner with passive house experience11
04.08.2020Surprising price increase just before signing17
11.02.2022Signature for the neighbor's construction project27
19.12.2022TGA planner difficulties, underfloor heating supply temperature + wastewater ventilation124

Oben