What does such documentation look like? It would then have to be presented during the house handover, right?
Text block:
The DIN 18014:2007-09 is still far too new to be "already" known to all parties involved in construction.
Execution according to the current DIN 18014:2014-03 is a prerequisite for meter registration. German electricians do not nearly all have a contractually binding VDE selection subscription, but many replace this by the supernatural ability to certify the execution of the grounding system as standard-compliant even after concreting. Where a connection flag sticks out of the ground, everything has to be okay, right?
Google who is allowed to install foundation grounding; forums are full of reports about building grounding conductors thrown in by masons, and you will always find a favor-eli who fills out the meter registration falsely out of concern for connection contracts.