we requested a quote for a prefabricated house with a basement and garage and then signed it. It was only during the meeting with the architect that we were informed that the base plaster has to be added and that we would have to decide which one is suitable.
This was never a topic in the preliminary discussions and negotiations. For us, it was clear that the connection between the basement and the ground floor, since we commissioned everything to a general contractor, must be included.
Are we completely wrong here, did the consultant simply withhold the costs from us, or should we have known that ourselves?
we requested a quote for a prefabricated house with a basement and garage and then signed it. It was only during the meeting with the architect that we were informed that the base plaster has to be added and that we would have to decide which one is suitable.
This was never a topic in the preliminary discussions and negotiations. For us, it was clear that the connection between the basement and the ground floor, since we commissioned everything to a general contractor, must be included.
Are we completely wrong here, did the consultant simply withhold the costs from us, or should we have known that ourselves?