Hi, if you have bought a new building, you have also received a heat demand calculation. It lists all the components and how they need to be insulated. And which WLGs. If you really have no idea at all, it will not be easy to make the vapor barrier 100% airtight. Seals, connections to the wall/floor, etc. The construction from below is gypsum board (in the bathroom green, Fermacell does not have green boards, there you can screw on the same board everywhere, but with a 5mm gap) then sheathing (preferably 23x72mm raw, dry) vapor barrier (please not the cheapest plastic foil (blue, blue-white...) there are better products, Isover, Würth db2...) and then your insulation in the cavities. Best solution 20cm compression felt WLG035, raw dry battens crosswise on the collar beams and then another 60mm mats 0.35 in there, then tongue and groove raw, dry. Then you have 26cm insulation and your wallet will thank you quickly.