How to do the foundation slab for a semi-detached house

  • Erstellt am 2011-07-12 07:38:40

perlenmann

2011-07-12 14:58:51
  • #1
Unfortunately, I do not have the complete planning at hand yet. So definitely remove the bubble wrap. Is the soundproofing mat even necessary? Can the joint not remain open? I just had a conversation with our expert. He said to remove the bubble wrap and then put in the perimeter. The perimeter is only supposed to prevent anything from falling in during masonry work and thus prevent contact between the floor slabs. My expert then said that before the masonry, the fiberglass wool will be placed against the neighboring wall before our masonry work, so nothing can fall in. Is that sufficient then?
 

E.Curb

2011-07-12 15:16:12
  • #2
If you have an expert, then you can already trust him. He is on site and knows the conditions.
 

perlenmann

2011-07-12 15:30:54
  • #3
Well, that's a package from the TÜV included in the house price. He was not on site because of the foundation slab. I only explained that to him over the phone.

Well, at least my site manager is now getting in touch with him. Let's see what they decide.
 

perlenmann

2011-07-13 14:06:26
  • #4
Oops, yesterday evening you already raised the walls to 1m high and now the wall to the neighbor is gone again. Now a slot 3cm wide is created and filled with Perimeter. According to the architect and the TüV, it should be like this, so it should fit, right?
 

Similar topics
04.11.2012Expert despite TÜV approval?13
01.10.2013Construction company would rather not have an assessor11
07.04.2020Interior walls: masonry or drywall?17
01.08.2018Construction company demands extra costs due to cooperation with appraiser21
07.02.2019Can bubble wrap be applied afterward?13
22.07.2020Grill corner walls height difference24
15.01.2021Bubble wrap not sealed16
07.05.2023Is it sensible for the expert to inspect the base plate?55

Oben