House construction according to the Building Energy Act still acceptable or better KFW55

  • Erstellt am 2021-12-03 13:19:56

Tom1978

2021-12-06 15:01:18
  • #1


Wouldn't it be better to have the brackets attached during the roofing? It should be cheaper than having it done afterward. We are having everything done. Two complete roof sides 13.27 kWp for €16,200 gross including power optimizers.
 

Mahri23

2021-12-06 15:32:57
  • #2
On the topic of IBN: we chose Jan. As a result, we gained almost 12 months in addition to the twenty years. I would not do Dec. Luckily, our air heat pump was already installed and could carry out the screed drying program "normally" without the heating element. But it was also summer. Therefore, the consumption was very limited.
 

Yaso2.0

2021-12-06 16:15:17
  • #3


It is probably or would have been cheaper, but we did not look into it in more detail when we decided against it.

I only asked the electrician if there were things that should be done now because it would be too complicated later, and this was the result.

For everything else, it is already too late. The crane will be dismantled tomorrow and the scaffolding is supposed to be taken down next week. Until then, I can no longer manage to reschedule anything.
 

Hangman

2021-12-06 16:28:23
  • #4


That's office-worker theory... that's what I thought too. Our solar installer just said that then something is planned based on hope that it fits, and during the later installation you find out that 2-3 cm are missing somewhere and you have to rework anyway. The practical solution is therefore actually to have the entire roof covered, and the solar installer removes individual roof tiles for the installation of the frame and quickly slots them in. That works completely without problems. Where our general contractor roofer and solar installer coordinated, however, was the fitting with storm clamps – where the frame went, these were omitted after the appropriate wind load calculation.
 

Similar topics
03.02.2021Solar technician from Münsterland / wanted regionally12
27.03.2023Roof covering and solar technician selection - Decision?98

Oben