Tom1978
2021-12-06 15:01:18
- #1
So, like here
and as far as I remember, there was also a field extension in the distribution box.
Wouldn't it be better to have the brackets attached during the roofing? It should be cheaper than having it done afterward. We are having everything done. Two complete roof sides 13.27 kWp for €16,200 gross including power optimizers.