We are currently building a single-family house with a garage, turnkey, through a general contractor. We are getting a heat pump with underfloor heating and would like to apply for the innovation grant through BAFA. The question now is whether we have to submit the offer to BAFA that the installer made to our GC or if the installer must issue this offer in our name. Only after we apply to BAFA may the installer confirm the chosen heating system to our GC. Thank you in advance for the answers!
 

Fuchur

2020-06-09 20:53:24
  • #2
What is absolutely necessary can only be explained to you with certainty by the BAFA. To avoid discussions, I would request an invoice in my name - either from the installer or from the GU as a separate service (the latter is what we did).
 

Grobmutant

2020-06-09 21:31:12
  • #3


Does that mean that construction has already started? The applications for the BAFA must be submitted before the project begins. Aren't you already too late?
 

Grobmutant

2020-06-09 21:32:42
  • #4
"The application must be submitted before project commencement. Project commencement is defined as the conclusion of a delivery or service contract attributable to the execution."
 

Fuchur

2020-06-09 21:37:14
  • #5
No, with the general contractor it is only too late when the specific heat pump to be installed has been ordered.

A general contractor contract for "HP from company X of series Y" is not yet the start of the project, as the specific model has not yet been determined, e.g. due to the lack of a heating load calculation.
 

tobi412

2020-06-11 08:54:41
  • #6
No, we are not too late. The heating system will only be ordered once the application has been submitted. According to BAFA, an offer does not have to be attached. Only upon request. Now the only question left is the amount of funding. Everywhere it says for new buildings from a certain annual performance factor up to 35% of the investment sum. However, since it always says "up to," I wonder if the 35% are tied to certain requirements and will be reduced accordingly if they are not met.
 

Similar topics
15.06.2016Bafa: Renewable Energy Heat Pumps with Test Certification32
07.10.2016BAFA funding tips38
23.09.2017Bafa innovation funding for heat pump possibly too late - what now?15
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
12.04.2019BAFA innovation funding air heat pump43
15.02.2020KFW55 funding + BAFA funding57
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
09.02.2020BAFA - Funding: House contract before application submission?10
27.03.2020When does BAFA pay out the funding (air-water heat pump in new construction)?10
03.06.2020KfW 55 + BAFA Funding - Costs and Subsidies24
24.05.2020Heat pump and BAFA - What is true and what is not?24
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
14.10.2020BU withholds "confirmation of the builder" for BAFA funding21
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.510
20.04.2021BAFA funding depends on the form "Confirmation of the Developer"20
03.01.2022Electricity meter for heat pump in combination with BAFA and photovoltaic22
01.08.2023BAFA Funding - What Waiting Time Is Realistic?27
25.04.2023Which type of funding should I choose? KfW, BAFA, tax?21
30.06.2023Cancellation of an already confirmed Bafa funding15

Oben