Menü
Menü
Anmelden
Registrieren
JavaScript ist deaktiviert. Für eine bessere Darstellung aktiviere bitte JavaScript in deinem Browser, bevor du fortfährst.
Forums
Shell construction
Foundation / Floor slab
Formwork for ground slab
Erstellt am
2025-10-06 21:44:29
Similar topics
05.06.2010
Basement made of high perforated bricks or concrete?
11
31.05.2015
Wastewater pipe concreted in the floor slab at the wrong location
29
26.10.2012
External perimeter insulation floor slab, basement mold risk
11
01.07.2013
Additional insulation in the Ytong basement (36 cm)
14
12.08.2015
Is insulation worth it beyond the new construction standard?
34
11.09.2016
Base plate - construction/insulation etc. - experiences please!
10
22.12.2016
Is rain harmful to concrete slabs?
12
11.10.2017
Sealing on Styrodur insulation?
14
20.08.2016
Base slab vs strip foundation
15
13.09.2016
Insulation under the floor slab EPS or XPS?
12
29.07.2018
Perimeter insulation under the floor slab and still XPS under the screed?
28
06.10.2016
Base plate with defects?
22
27.11.2016
Double insulation below and above the floor slab?
10
26.02.2018
Insulation under reinforced concrete floor slab KFW55
20
09.02.2019
Ground slab with strip foundation and frost skirt
23
29.12.2020
Y-Tong vs Concrete without extra insulation in practice (heating costs)
38
01.07.2019
KFW 55 - Insulation under the floor slab
37
02.02.2020
Insulation under the floor slab - Is it sensible? Experiences
39
30.06.2020
Base plate, too little cement in the concrete
19
29.04.2025
Insulation of the ground slab in the basement with thermal stone
12
Oben