Simon-189
2023-09-27 15:17:02
- #1
There are still formerly planned floor or ceiling openings. The duct ventilation of the bathroom on the upper floor could therefore fit, that this pipe continues into a possibly existing basement? Are the thin walls around the openings present or only planned and never executed?