Since I do not know the structure of your base area, just roughly. In new construction, there is often an insulation board in the ground. Behind the insulation, it should be sealed, and above the insulation board there is sometimes also a plaster mortar. Above this plaster, the sealing should then be extended down into the ground and about 5 cm above the ground level upwards. A base about 30 cm above the soil surface should be formed upwards. This mortar should be suitable. There are, for example, lightweight base plasters, reinforcing mortars for the base, or classically cement plasters. However, this cannot be specified more precisely without details of your base structure. You can find countless execution details from mortar manufacturers on this.