Yes, it was free here too, but that was a few days ago. Possibly, there may be costs for the construction power connection.
One ultimately agrees that if a charging station is operated at this connection, it must be controllable. This is basically the same thing as with heat pump electricity, where one grants the network operator the right to interruption times in exchange for a price advantage.