I had for the screed drying with drying device, which was connected to the underfloor heating, also just under 2100 kWh...
 

Andre77

2019-10-04 21:56:30
  • #2
So, I can report completion. Today the termination confirmation came from the basic supplier where the construction power was booked. In about 2.5 weeks, the "switch" will then take place. Changing electricity providers with construction power is therefore possible.
 

goalkeeper

2019-10-04 21:57:28
  • #3


Can you report how expensive NetzeBW and now your new supplier are?
 

Andre77

2019-10-04 22:13:57
  • #4
Um, here it is or would be Enso as the basic supplier.

At first, you get the most expensive tariff "pushed on you":

Enso.Strom.Profi
€201.76 gross annual base price
29.61 ct/kWh

At the same time, there was an offer to switch to:

Enso.Strom.Twist
€124.95 gross annual base price
28.04 ct/kWh

Online, there was still a switch available to:

Enso.Strom.Online
€113.05 gross annual base price
27.37 ct/kWh

I had also chosen this one, retroactively from the start of the contract to get down from the high base price of the Profi tariff.

Now I have chosen from lition Energie, a kind of electricity exchange.
€6.82/month, so €81.84 gross annual base price
26.07 ct/kWh

Currently, Lichtblick still offers a €75 starting credit, so I'm going to try that one again now.
 

Similar topics
06.12.2017Until when must construction power be taken?22
07.01.2016Basic utility provider house connection - then switch provider?11
31.10.2016Heating the screed with the utility provider?!12
19.10.2017Temporary power supply - What costs are involved?19
05.07.2018Temporary electricity stolen - amount of compensation?17
20.07.2018Construction power or house connection? How much construction power is needed?12
19.03.2019Construction power is being connected. Does the builder have to be present?10
10.01.2022Determine construction power costs / eOn charges too much36
09.10.2024Construction electricity/construction water costs are the responsibility of the builder11

Oben