How should I know - A larger crane was in use for 5 months, no building drying. The 55€ wouldn't have even covered the basic fees. In addition, the electricity meter arrived quite late due to unfortunate communication with the photovoltaic system installer and the grid operator.
We did not have 600€ in the end for the complete construction electricity through enbw with the drying via the underfloor heating / air-water heat pump.