Duration / Effort of own contributions?

  • Erstellt am 2019-08-03 20:15:54

allstar83

2019-08-03 20:15:54
  • #1
Hello everyone,

to better estimate my own work efforts in house construction, I would appreciate your "guidelines" regarding the effort and duration.
Please estimate how long the following tasks approximately take - considering that two people are working together (skill level "rather inexperienced"):

    [*]Laying click vinyl on about 80 sqm on one floor?
    [*]Insulation between rafters in the attic (area without dormer windows) - usable floor area of the floor is about 120 sqm (I cannot currently provide the sqm number of the gable roof area)?
    [*]Sanding and painting walls (starting from gypsum Q2) on about 112 sqm of living space?

Thank you very much!
 

HilfeHilfe

2019-08-03 21:12:17
  • #2
oh dear,,,,,,,,,,,,,,,
 

allstar83

2019-08-04 12:42:36
  • #3
I would have assumed 5 days each... Does that work?
 

seat88

2019-08-04 12:53:33
  • #4
Nope... Never. Unless you work 24/7. Count on a good four weeks for everything. At least....
 

Bookstar

2019-08-04 13:29:22
  • #5
You lay 80m2 of vinyl easily and casually in 3 days. No idea about the rest...
 

Yosan

2019-08-04 14:46:16
  • #6
For the vinyl, 5 days will definitely be enough. For painting, I wouldn't be sure. If 2 coats are necessary, then probably not.
 

Similar topics
11.01.2014Click vinyl on floor tiles10
07.11.2016Vinyl click or adhesive version?11
25.07.2017Flooring. Laminate, engineered parquet, vinyl? Where is the best place to buy?60
24.07.2017Vinyl: Only glue on underfloor heating?33
07.08.2018Full vinyl vs vinyl with HDF board27
26.02.2018Which flooring - tiles or vinyl in the living/dining area?18
31.10.2018Which flooring? Tiles, vinyl, or parquet? Tips?23
01.09.2020Subfloor Preparation Click Vinyl19
19.07.2020Covering for indoor concrete stairs -> wood, vinyl, natural stone?29
09.04.2021Anhydrite screed - laying vinyl at 50-70 millimeters thickness?10

Oben