quisel
2019-09-04 07:30:42
- #1
Normally, to my knowledge, a supplementary offer must be made.
| Similar topics | ||
| 10.02.2020 | Must the construction company itemize the costs per trade? | 13 |
| 02.04.2020 | Possible building plot - shaft on the property | 28 |
| 22.04.2021 | Costs for the heating & sanitary trade | 86 |
| 25.05.2022 | Cover shaft 1.5 x 1.5 concrete like structure | 25 |
| 28.05.2024 | Water in the shaft of the lifting system | 19 |