Hhaydee 2017-11-08 06:37:34#1Does the construction site power connection have to be checked monthly by the electrician? How long does the inspection take?
Does the construction site power connection have to be checked monthly by the electrician? How long does the inspection take?
Hhaydee 2017-11-08 07:01:33#3Was wondering. Rent okay. Additional inspection of 1.5 hours every month surprises me. Had wondered if he had walked to the box.
Was wondering. Rent okay. Additional inspection of 1.5 hours every month surprises me. Had wondered if he had walked to the box.
Ssaar2and 2017-11-08 07:27:52#4No, it doesn't have to. Yes, it does have to, it says so in the VDE BGIs and in the contract that the builder and electrician conclude with each other. In theory, the RCD test button should even be pressed daily at work.
No, it doesn't have to. Yes, it does have to, it says so in the VDE BGIs and in the contract that the builder and electrician conclude with each other. In theory, the RCD test button should even be pressed daily at work.
Hhaydee 2017-11-08 11:08:17#5There is no contract, at least not between us and the electrician. Need to talk to the [GU]. Then there should actually be test protocols, right?
There is no contract, at least not between us and the electrician. Need to talk to the [GU]. Then there should actually be test protocols, right?
Ssaar2and 2017-11-08 12:14:36#6There is no contract at least not between us and the electrician. Better talk to the general contractor. Then there should actually be inspection reports, right?Yes, there should be.
There is no contract at least not between us and the electrician. Better talk to the general contractor. Then there should actually be inspection reports, right?Yes, there should be.