Illya-Berlin
2019-06-17 23:51:59
- #1
Hello,
we will soon build a city villa with 2 full floors in Brandenburg (Barnim).
Construction type: 2-layer masonry (lightweight expanded clay wall elements 15cm thick + 14cm mineral wool + 11cm clinker, so wall thickness: 40cm).
Now we have to decide whether we need an air conditioning system so that the house construction company can provide the appropriate openings and electrical installations. For us, only a split unit for one or two rooms is an option (kitchen, because it gets hot when cooking / living room or bedroom).
Unfortunately, we cannot assess whether it is really necessary, whether the rooms get hot during such hot days as the last 2 weeks or whether they remain cool due to the construction method of a single-family house.
Does anyone have experience?
We thank you for any advice.
Best regards
we will soon build a city villa with 2 full floors in Brandenburg (Barnim).
Construction type: 2-layer masonry (lightweight expanded clay wall elements 15cm thick + 14cm mineral wool + 11cm clinker, so wall thickness: 40cm).
Now we have to decide whether we need an air conditioning system so that the house construction company can provide the appropriate openings and electrical installations. For us, only a split unit for one or two rooms is an option (kitchen, because it gets hot when cooking / living room or bedroom).
Unfortunately, we cannot assess whether it is really necessary, whether the rooms get hot during such hot days as the last 2 weeks or whether they remain cool due to the construction method of a single-family house.
Does anyone have experience?
We thank you for any advice.
Best regards