Hello,

I am in the process of buying a house. Low energy house built in 2014 in Rhineland-Palatinate. Now I have heard from my expert that I should request the construction acceptance confirmation from the owner. The owner told me that it does not exist. The building authority only carries out sporadic inspections after the construction end is reported by the builder. He said that the land registry office measured and registered everything and nothing else is necessary. Now I am a bit puzzled. Is this really the case?

I have zero knowledge about building.

Who can explain to me exactly how this really is?

Kind regards,
Paul
 

ypg

2017-07-12 22:34:46
  • #2
You, I have no idea.

But I would insist on _all_ documents. After all, there is still a warranty on the piece of jewelry. This also includes the acceptance protocols. If he no longer has the documents, I assume he has something to hide about the house.

Regards, Yvonne
 

77.willo

2017-07-12 22:38:29
  • #3
The acceptance protocol has nothing to do with the building authority. If the building authority does not approve, no documents will result from it...
 

ypg

2017-07-12 23:05:24
  • #4


Hehe... I got that confused, as you can see. Anyway, my first sentence still counts.
 

paulo78

2017-07-13 02:34:32
  • #5
Hello,

I don't understand. Please explain further. After construction, you have to notify the building authority that you are finished. Or not?
How are, for example, separate construction documents supposed to be checked?
 

paulo78

2017-07-13 02:37:27
  • #6
I read the following on the page "Bau Anzeiger". See image
 

Similar topics
28.12.2013Conversion of agricultural land to building plot, objection, building authority, building regulations12
20.06.2016Building Authority Approval10
11.04.2017Building authority wants site inspection116
04.07.2017Problems with the building authority due to soil slips and retaining walls!27
30.01.2021The building authority rejects the building application because the house is planned too far back86

Oben