Costs of soil assessment / geotechnical investigations

  • Erstellt am 2017-01-10 20:25:22

Dahi72

2018-11-07 05:27:13
  • #1
Hello everyone,

has anyone already conducted a survey of the property (regarding possible unexploded ordnance/duds)? How extensive does it need to be? Should we immediately hire a bomb disposal company or is an expert (engineering office) sufficient?
: I would also be interested in the company for the preparation of the geotechnical investigation. Can you send me the link? Many thanks in advance
Best regards
 

Traumhaus2020

2019-02-05 22:00:07
  • #2
Here (Greater Munich area) the geologists (at least the two I called) demand €2500-3500!
: I would also appreciate the link

Regards
Alro
 

Niloa

2019-02-06 14:56:43
  • #3
I have a question about: do you need to know exactly where the house will be located before the soil survey?
 

Zaba12

2019-02-06 15:11:22
  • #4
Makes sense for the geotechnical report, so yes.

In the soil analysis, I believe soil/excavated material is "collected" and mixed at some diagonal endpoints and analyzed.

Soil analysis and geotechnical report are two different things. You need the second for the structural analysis and ground treatment. The first one is for the landfill.
 

sge-freak

2019-02-14 09:48:55
  • #5
Hello, I would be very grateful if you could also send me this link sometime. I currently have an offer as well that would cost over €2,000 with the additional soil analysis. Thank you very much!
 

Bau_Bambi

2019-02-27 13:20:08
  • #6
A question about the reports: Are they necessarily required for the construction of a single-family house? If the architect does not specifically carry this out or have it done by the structural engineer: Can I assume that a report has been made, or am I at risk that the structural engineer calculates with flat rates?
 

Similar topics
24.07.2016Structural engineer costs - How much does a structural engineer or architect cost?17
18.05.2011Minimum scope of services Architect + structural engineer possibly self-performance?10
09.10.2012Is a soil investigation report included in prefab house construction?10
28.07.2015Site investigation report not correct - and now?10
15.08.2016Civil engineer contradicts structural engineer27
03.08.2016Structural engineer and KfW55 certification12
11.01.2018Partition wall thickness for duplex house. Structural engineer plans 17.5 cm14
02.04.2018Offer structural engineer + thermal insulation certificate Energy Saving Ordinance 201616
11.02.2021Structural engineer needed for rough assessment of load-bearing capacity25
05.12.2021Cost of structural engineer single-family house23