We paid €42 gross per cubic meter for excavation for Z.1.1. However, only for the removal. We also had more expensive offers. Our arsenic level was slightly above the threshold.
 

arnonyme

2019-02-14 12:40:07
  • #2
About 29 thousand net just for disposal.
Soil analysis did not interest the deep foundation contractor (fortunately).
There were about 800m³ that had to be hauled away, which corresponds to about 60 trucks.

At first, I also thought that on an 1100sqm plot we would have to dispose of almost nothing...
No way, almost everything was hauled away, except for a few cubic meters that we can use for filling.
And if you’re unlucky, as was the case with us, you can completely dispose of the excavation for the workspace and fill it back up with expensive gravel or recycled material...

Of course, it always depends on the area; around here, all landfills are supposedly full because the excavation from this stupid train station in Stuttgart is distributed to all the landfills in the vicinity. Accordingly, costs naturally rise because the landfills simply double their prices at the turn of the year.

I already said next time without a basement and instead 3 floors.

But even then, you can be unlucky. A home builder a few houses down from us had to dig out half a basement because the ground was not stable enough, even though it was built with a slab foundation.
 

Zaba12

2019-02-14 16:24:15
  • #3
Nice to read something like this for once. No one ever believes me :p when I write something like that
 

arnonyme

2019-02-14 16:42:13
  • #4
I am rather wondering how you arrive at 2000 m³, how big is your house, please??? We have a floor area of 120m² and come to about 800m³ at a depth of approximately 3.20m.
 

opalau

2019-02-14 17:30:56
  • #5


 

MelanieSH

2019-02-14 17:48:16
  • #6
I have just received an offer, living in Schleswig Holstein. Only disposal of stored excavation was 11.50 euros net. I find that pretty good.
 

Similar topics
11.07.2011Basement costs realistically without excavation and removal?21
08.12.2015Construction costs for KFW70 house with basement turnkey15
09.06.2013Costs of earthworks without basement15
27.08.2015Temporary storage of excavation from the neighbor's property?22
12.07.2017Excavation of construction pit - analysis of excavation material?12
28.06.2017Basement costs - Is the floor slab offset?17
15.03.2018When is a slope a slope? Basement vs. slab19
19.08.2017Construction costs in BW for a single-family house with a 200m2 basement and double garage38
13.04.2020Project Homeownership - Basement, Ground Floor Plan - Tips76
07.09.2018160m2 detached house in timber frame construction on the north slope with basement100
02.10.2018Excavation for the basement, your opinion on the cubic meters31
02.04.2019Building plot: Massive fill or better basement with excavation?28
27.06.2020Level the basement or the plot?43
01.07.2020Calculation for a single-family house with 175m² living area, basement, and double garage79
13.01.2021Costs - Excavation for single-family house with basement27
15.07.2020Soil survey even if I don't build a basement?13
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
22.09.2021Is the basement cost estimate realistic?32
03.03.2024Basement or ground slab: which is more sensible for the property situation?55
01.01.2025Floor plan, house layout EFW 150m2, basement + granny flat - feedback desired67

Oben