TmMike_2
2022-08-05 10:55:03
- #1
If a civil engineer is in town and you get along well with him, I see no problem. I also cannot imagine that a 20t mobile excavator would take longer than 5 hours for the excavation.
Similar topics | ||
15.08.2016 | Civil engineer contradicts structural engineer | 27 |
31.07.2019 | Filling and compacting the ground for the house | 155 |
24.03.2018 | Compact gravel layer of about 25 cm - Experiences | 11 |
20.04.2020 | Can Z0 material be dumped without compaction? | 11 |
04.06.2020 | Civil engineer proposes deviations from the drainage plan | 10 |
14.09.2021 | Civil engineer calculates excavator performance by tons - experiences? | 21 |