McEgg
2017-03-03 09:21:51
- #1
We are getting a gas condensing boiler in the new building. Now I have told the general contractor that I would also like to have three gas lines laid from the technical room in the basement:
- [*]Line to the living room to connect a gas fireplace (~11m) [*]Line to the kitchen to be able to connect a gas stove if needed (~13m) [*]Line to the terrace to connect a gas grill or heater (~8m)