PhoenixDH
2013-07-16 07:00:15
- #1
Hello forum,
I registered here because we want to build a prefabricated house in the near future.
In advance, I of course want to have as much clarified as possible, especially the technology.
The Telekom connection is clear, 384€ flat rate, regardless of whether you use it or not.
I also had an offer made by Kabel Deutschland for setting up a transfer point.
The whole thing should include as much DIY work as possible. Now I have received an offer of 199€.
The service: laying the cable through the channel I prepared on the property into the house and connecting the transfer point.
But what I wonder is: How does the cable get to my building site if it is not there yet and who bears the costs?
I guess KD does, right?
Because in the letter it says:
The house feed includes the costs for civil engineering and installation work including material and for the excavation permit from the road maintenance authority of the municipality. ...
So I think the price is included, right?
I have already called the hotline once, but I do not always trust them and prefer to get more solid information.
Also, I was told on the phone that I should sign up now because next year the costs would 5 fold! I can hardly believe that.
And the question that still arises for me: does the price only apply if I also use the connection?
Thanks to you!
I registered here because we want to build a prefabricated house in the near future.
In advance, I of course want to have as much clarified as possible, especially the technology.
The Telekom connection is clear, 384€ flat rate, regardless of whether you use it or not.
I also had an offer made by Kabel Deutschland for setting up a transfer point.
The whole thing should include as much DIY work as possible. Now I have received an offer of 199€.
The service: laying the cable through the channel I prepared on the property into the house and connecting the transfer point.
But what I wonder is: How does the cable get to my building site if it is not there yet and who bears the costs?
I guess KD does, right?
Because in the letter it says:
The house feed includes the costs for civil engineering and installation work including material and for the excavation permit from the road maintenance authority of the municipality. ...
So I think the price is included, right?
I have already called the hotline once, but I do not always trust them and prefer to get more solid information.
Also, I was told on the phone that I should sign up now because next year the costs would 5 fold! I can hardly believe that.
And the question that still arises for me: does the price only apply if I also use the connection?
Thanks to you!