Correct. The first offer was basically a lengthy list of individual items, cable lengths in the kilometer range, and surcharges for the current copper doping. Pretty unpleasant for the end consumer. The mixed calculations are not worse in that sense, I think. Especially since much of the technology is located far away from the distributor.