Fiddy
2012-11-16 03:29:15
- #1
Hello forum,
Parallel to my other thread about financing the renovation of the old building, this one is about the total cost estimate.
The following facts: The house is still occupied on the ground floor by my wife’s grandmother. No renovation is planned there. The upper floor (100m2) will remain as per the layout except for two walls that will be removed. Floor coverings (cork in parquet look) and wall coverings (painted plaster) will be installed by ourselves. In addition, there will be an extension of the warehouse which will add an additional 60m2 of living space. The attic (100m2) will be extended upward by about 1.20m. The roof including the rafters must be newly constructed on top. The 60m2 extension serves as a roof terrace in the attic. A dormer with a terrace door must be planned here. The whole thing should reach approximately [KfW 70 Standard]. Trades carried out by friends and acquaintances are the following: architect, mason, gas, water, electricity, tiling, heating installer, and the kitchen at staff discount.
What do you think the estimated costs will be?
Greetings from the Palatinate
Parallel to my other thread about financing the renovation of the old building, this one is about the total cost estimate.
The following facts: The house is still occupied on the ground floor by my wife’s grandmother. No renovation is planned there. The upper floor (100m2) will remain as per the layout except for two walls that will be removed. Floor coverings (cork in parquet look) and wall coverings (painted plaster) will be installed by ourselves. In addition, there will be an extension of the warehouse which will add an additional 60m2 of living space. The attic (100m2) will be extended upward by about 1.20m. The roof including the rafters must be newly constructed on top. The 60m2 extension serves as a roof terrace in the attic. A dormer with a terrace door must be planned here. The whole thing should reach approximately [KfW 70 Standard]. Trades carried out by friends and acquaintances are the following: architect, mason, gas, water, electricity, tiling, heating installer, and the kitchen at staff discount.
What do you think the estimated costs will be?
Greetings from the Palatinate