PeterLustig49
2013-06-13 12:00:51
- #1
Hello everyone,
we have received approval for a plot of land in a new development area in Hessen.
Building area = 10m x 12m.
Now the calculations begin.
From various forums and websites, I have gained an overview of the costs.
Here is my breakdown with a request for comments, opinions, additions, etc.
(I hope to be able to reduce the costs somewhere, as a 320K€ loan is steep)
we have received approval for a plot of land in a new development area in Hessen.
Building area = 10m x 12m.
Now the calculations begin.
From various forums and websites, I have gained an overview of the costs.
Here is my breakdown with a request for comments, opinions, additions, etc.
(I hope to be able to reduce the costs somewhere, as a 320K€ loan is steep)
Plot | m² | € per m² | |||
Price | |||||
Property transfer tax | |||||
Land register entry | |||||
Notary | |||||
Surveying costs | |||||
Soil report | |||||
Preparation and development | |||||
Excavation work | |||||
Connection costs to public utilities | |||||
Building - Structural construction | m² | € per m² | |||
Costs masonry and reinforced concrete work | |||||
Roof | |||||
Carpentry costs | |||||
Tinsmith and roofer costs | |||||
Doors + windows | |||||
Windows, patio doors | |||||
Front door | |||||
Interior doors and frames costs | |||||
Stairs | |||||
Basement | |||||
Exterior plaster | |||||
Chimney | |||||
Building - Technical systems | m² | € per m² | |||
Sanitary | |||||
Sanitary equipment | |||||
Sanitary installation | |||||
Interior | |||||
Interior plaster | |||||
Screed and floor structure | |||||
Tiling | |||||
Flooring costs | |||||
Drywall | |||||
Metalworker | |||||
Electrics | |||||
Laying electrical conduits | |||||
Electrical wiring | |||||
Heating | |||||
Heating boiler | |||||
Laying heating pipes | |||||
Radiators and underfloor heating | |||||
Residential ventilation | |||||
External facilities | |||||
Carport | |||||
Garden, driveway | |||||
Furnishings | |||||
Fireplace | |||||
Kitchen | |||||
Furniture | |||||
Additional construction costs | |||||
Building permit | |||||
Construction electricity, water and disposal | |||||
Construction insurance | |||||
Builder’s liability insurance | |||||
Chimney sweep | |||||
Provision and construction interest | |||||
Architect | |||||
Association of private builders | |||||
Total | |||||
Buffer | |||||
Total + buffer | |||||
Equity capital | |||||
Loan amount |