Hello everyone,
I am having a hard time deciding whether we should contract our single-family house with basement and double garage as a turnkey project or as a shell construction with all trades separately. Single-family house 185 m² living space Garage 63 m² Turnkey offer: 630-650k€ gross Shell construction including exposed roof truss offer: 320k€ gross
My question is how much I have to calculate for the other trades? How much could I save if I contract the trades separately instead of turnkey?
- Plaster inside and outside - Screed basement, ground floor and upper floor - Heating heat pump - Central ventilation - Sanitary - Electrical without bus - Windows including shading - Painting works - Floor coverings
Did I forget anything?
Best regards and thanks in advance for your support
I am having a hard time deciding whether we should contract our single-family house with basement and double garage as a turnkey project or as a shell construction with all trades separately. Single-family house 185 m² living space Garage 63 m² Turnkey offer: 630-650k€ gross Shell construction including exposed roof truss offer: 320k€ gross
My question is how much I have to calculate for the other trades? How much could I save if I contract the trades separately instead of turnkey?
- Plaster inside and outside - Screed basement, ground floor and upper floor - Heating heat pump - Central ventilation - Sanitary - Electrical without bus - Windows including shading - Painting works - Floor coverings
Did I forget anything?
Best regards and thanks in advance for your support