Hello everyone,
we have now received an offer for a house with the following key data from a regional general contractor.
The offer price is approx. 310,000 euros including 19% VAT.
For connections (electricity, water, sewage, rainwater, telecom) approx. 6,000 euros are estimated.
Official fees, surveying etc. are estimated at approx. 8,000 euros.
Additionally, we should budget approx. 20,000 euros for garden and paving work.
The plot (500 m², fully developed) has belonged to us for some time, so there should be no further costs here.
What do you think? Is that more or less okay and realistic?
Is there anything else to consider?
Best regards, Olli
we have now received an offer for a house with the following key data from a regional general contractor.
[*]Bungalow, approx. 115 m² built-up area with a livable attic
[*]Individually designed, solid construction (Ytong, plaster facade)
[*]Total living area approx. 140 m²
[*]Attic fully developed (guest room and hobby room)
[*]Concrete ceiling above the ground floor with light cutout
[*]Steel stringer staircase
[*]KFW 55 standard
[*]Air heat pump (split unit, plus water storage) underfloor heating.
[*]High-end electrical equipment (satellite system, network sockets, 50 power outlets, etc.)
[*]Main bathroom with shower, tub, toilet and washbasin
[*]Guest bathroom with toilet, washbasin + shower
[*]Turnkey including painting and floor coverings (tiles + parquet)
[*]Windows with electric blinds, anthracite
[*]Including a masonry garage 9x4 m with gable roof + electric door, windows, additional door.
[*]Floor slab, all earthworks, connections, etc.
[*]The offer includes all architectural services and official fees.
The offer price is approx. 310,000 euros including 19% VAT.
For connections (electricity, water, sewage, rainwater, telecom) approx. 6,000 euros are estimated.
Official fees, surveying etc. are estimated at approx. 8,000 euros.
Additionally, we should budget approx. 20,000 euros for garden and paving work.
The plot (500 m², fully developed) has belonged to us for some time, so there should be no further costs here.
What do you think? Is that more or less okay and realistic?
Is there anything else to consider?
Best regards, Olli