Hello everyone,

attached are my construction costs. Maybe it will help one or the other.

Built was:
- 700 sqm plot
- ~150 sqm living space, pitched roof, converted attic
- Plastered, flat roof dormer clad
- Double garage, 54 sqm, sectional door
- 100 sqm paving
- Air heat pump

Extras:
- Chimney flue (there wasn’t enough left for the stove )
- Flat roof tiles
- 14 floor-to-ceiling windows, one large sliding door, one roof window
- Aluminum front door
- White ash staircase
- Bus system, >120 sockets, electric shutters
- 66 LED recessed spotlights, all dimmable
- Doorbell from a brand manufacturer (camera, remote access)
- Walk-in shower, washbasin with two sinks
- Shower and urinal in the guest WC
- Laundry chute
- Security profile locks (three doors)

Costs (all prices rounded for clarity):
Plot 63,000€
Additional costs (notary, etc.) 8%
Connections (electricity, water) 4,000€

House ~1,400€/sqm
(incl. building permit, electricity, water, appraiser)
Interior finishing ~12,000€
(Additional costs for tiles, painter, flooring)
LED plus dimmer 3,600€
Additional bathroom costs 5,300€

Kitchen (kitchen block) 11,000€

Electricity (material, purchase prices!) 17,000€

Paving work 12,000€

Tools 1,600€

Total
Planned 340,000€
In the end it was 6% more - ~360,000€.

The biggest unknowns were the additional costs for bathroom and electricity.
I think our house construction went quite well in terms of costs. This is partly due to the rural area, partly due to the craftsmen with whom I have partly friendly contacts.

I underestimated my contribution to the topic of own work. I "only" did the electrical work and, as is often read here: An expert needs a third of the time.

Greetings, torsan

PS: If necessary, I can gladly break down the costs further.
 

Legurit

2015-11-30 15:33:05
  • #2
Was the interior finishing and electrical work added on top of the 1400 €/sqm?
 

torsan

2015-11-30 15:39:05
  • #3
Yes. Standard electrical work would have been an additional cost of €5000. Interior finishing was extra for me: additional costs for tiling, wallpapering all walls and ceilings, laying vinyl floors by a professional floor layer (not click). The €1400/sqm is therefore "turnkey" without electrical work. Greetings, torsan
 

Paulus16

2016-09-03 11:12:07
  • #4
Hello torsan, in which year did you build, 2014-2105?
 

Similar topics
14.08.2012Build a home? Land in prospect19
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
07.07.2014Develop the property yourself13
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
31.03.2015Property / Financing amount / Insurance? Experiences10
21.03.2016Land Costs - Building and Financing a House29
02.03.2016Plot found in new development area - Build now?19
21.04.2016Is financing with land and equity possible like this?20
08.08.2016Connection costs for telecom, cable, electricity10
26.02.2017Ceiling above the shower - LED spots12
24.04.2017Buying land without a soil survey?13
03.06.2018Liability issue regarding additional costs of a planning favor12
11.10.2019What to consider when dealing with a rear property?10
14.11.2019Construction contract additional costs foundation reinforcement?10
30.05.2020Support hanging and filling - Additional costs?31
01.02.2021Single-family house 159 sqm - Straight plot - Correctly calculated?26
23.01.2021Laying tiles additional costs55
05.04.2022Feasibility financing new construction (land + semi-detached house or semi-detached half)93
20.04.2024Tiling in a level-floor shower34

Oben