In December 2022, we had a split air conditioning system retroactively installed in our house from 1996.
For this, we applied for the BaFa subsidy in August 2022 and also received confirmation from BaFa at the end of 2022.
After uploading the necessary documents to the portal, we have now received a rescission notice because the invoice supposedly shows that the technical minimum requirements were not met. The letter does not specify in what way.
We are now filing an objection because, to our knowledge and that of the installer, all requirements were met. The reasoning for the objection is difficult because no details regarding the reason for the rejection can be found in the letter.
Has anyone had experience with this or an idea of whom to contact?
Thank you in advance.
For this, we applied for the BaFa subsidy in August 2022 and also received confirmation from BaFa at the end of 2022.
After uploading the necessary documents to the portal, we have now received a rescission notice because the invoice supposedly shows that the technical minimum requirements were not met. The letter does not specify in what way.
We are now filing an objection because, to our knowledge and that of the installer, all requirements were met. The reasoning for the objection is difficult because no details regarding the reason for the rejection can be found in the letter.
Has anyone had experience with this or an idea of whom to contact?