Hello everyone,
we will finally start building soon, today I received the preliminary schedule of the individual trades from the main contractor.
What confused me was the fact that the Blower Door Test was listed at the very end, about 1 calendar week before the planned acceptance. Until now, I thought you do it as soon as the building is airtight (or should be), i.e. when all windows and doors are installed and the roof is finished. Then it would also be much easier to make improvements if the test should show leaks.
Are there any specifications, DIN, etc., regarding the timing of the test?
Thank you very much in advance!
we will finally start building soon, today I received the preliminary schedule of the individual trades from the main contractor.
What confused me was the fact that the Blower Door Test was listed at the very end, about 1 calendar week before the planned acceptance. Until now, I thought you do it as soon as the building is airtight (or should be), i.e. when all windows and doors are installed and the roof is finished. Then it would also be much easier to make improvements if the test should show leaks.
Are there any specifications, DIN, etc., regarding the timing of the test?
Thank you very much in advance!