We also have the Schwarze Wanne and the order for us was from bottom to top 1. cleanliness layer, 2. bitumen + welding membrane, 3. insulation, 4. floor slab. Above that makes no sense in my opinion, as the water would probably also rise up in the walls if it comes through the floor slab.