The house connection is calculated as follows (edis):
Network connection house connection pillar up to 100 A = 1023.27
Commissioning network connection = 108.40
Additional length 32 meters = 817.28
Total gross: 2319.25 euros
Then there is construction electricity calculated for 60 days = 550 euros
And additionally, we are supposed to pay again for the connection from the house connection pillar into the house. Costs currently not known.
I find the prices extremely excessive.
Briefly about the house.
The house is about 45 meters away from the property boundary.
We are building a simple 1.5-story house with an air heat pump.
I would appreciate feedback.
we are building a house in Brandenburg and I have now received the cost breakdown from the local network operator. However, I have to say that I find the prices a bit high. Could you please take a look:
The house connection is calculated as follows (edis):
Network connection house connection pillar up to 100 A = 1023.27
Commissioning network connection = 108.40
Additional length 32 meters = 817.28
Total gross: 2319.25 euros
Then there is construction electricity calculated for 60 days = 550 euros
And additionally, we are supposed to pay again for the connection from the house connection pillar into the house. Costs currently not known.
I find the prices extremely excessive.
Briefly about the house.
The house is about 45 meters away from the property boundary.
We are building a simple 1.5-story house with an air heat pump.