Additional costs for sockets and network

  • Erstellt am 2017-05-12 12:15:56

Nordlys

2017-05-12 23:46:08
  • #1
If it is a real developer, they are also the client and can therefore set the rule that extras must be ordered through me. They then hand over a finished house to me, I pay, I am the buyer. But if I am the client and thus the principal, I can order my additional sockets wherever I want. If necessary, I can also install them myself. As the client, none of us should accept contracts that prohibit such things. Also, none of us should accept contracts that forbid entering the construction site or require prior notification or similar. It is our land, our house, paid for in installments. What I have paid for belongs to me. Karsten
 

bon1980

2017-05-13 00:04:10
  • #2
Even if he makes the rules, there are also real developers who are fair with additional requests, do not charge exorbitant prices for upgrades, and with whom you can settle everything directly with the executing craftsmen. We can also go to the construction site at any time and of course we do... You must not generalize building with a developer any more than the other models...
 

Caspar2020

2017-05-13 06:44:39
  • #3
In the original poster's case, it is a real property developer.
He is buying, among other things, a condominium.

Of course, you can't generalize; but at least with the developer projects in our immediate vicinity, things are really taking off.

It starts with the fact that practically the very last remaining areas are being successfully marketed. Next to the terrace is a main road at the outskirts of town; at the end of the terraces is a gas station with 24-hour operation; only separated by a sheet metal fence.

The price was around 275,000 to 3xx,000 for an apartment.
(This place has just under 30,000 inhabitants)
 

Changeling

2018-07-04 12:27:28
  • #4
I am just going to join this topic now, as it is exactly the same situation for me.

My electrician wants 30€ net per network double socket and per single socket (Gira System 55) including everything. It seemed a bit high to me "for that little plastic," but apparently I am not that far off the ideal price if I read the previous comments...

Additionally, 2.80€ per meter of network cable and 5.60€ for the conduit come on top (also net prices including installation).
 

Malz1902

2018-07-04 12:35:15
  • #5
Socket was 24€ with us tutti kompletto
 

Fuchur

2018-07-04 22:05:56
  • #6
Our general contractor offer: 94€ per socket. 34 distributed in the house included.

Besides sanitation, the reason for us moving away from the general contractor. We have now planned 170 sockets and 28 LAN. That would have made us poor.
 

Similar topics
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
15.04.2015Duplex construction: Joint or separate developer?20
13.06.2015New construction with developer / construction drawing documents23
09.09.2015Buy land separately from the developer13
24.12.2015Single-family house, Energy Saving Ordinance 2016, developer recommends additional insulation - is it sensible?39
30.08.2019Is it sensible to have a building surveyor for condominiums from the developer?11
09.02.2020Developer | Special Request | Cost Assumption38
25.07.2021Semi-detached house: two contracts (landowner and construction company)41