Tobiax
2013-02-05 10:52:08
- #1
Hello!
We have a plot of land. The building application is already with the city. However, since the authorities always take a bit longer, we want to complete as many tasks as possible in advance.
Therefore, my question is, what is allowed or sensible.
These things are already running in parallel:
- Soil survey
- Structural engineer
- Tree felling (including permission)
I can still think of the following:
- Removing the topsoil
- Hole for the foundation slab
- ???
Can you think of anything else?
Tobiax ...
We have a plot of land. The building application is already with the city. However, since the authorities always take a bit longer, we want to complete as many tasks as possible in advance.
Therefore, my question is, what is allowed or sensible.
These things are already running in parallel:
- Soil survey
- Structural engineer
- Tree felling (including permission)
I can still think of the following:
- Removing the topsoil
- Hole for the foundation slab
- ???
Can you think of anything else?
Tobiax ...