Good evening,

please forgive me if this topic has already been answered.
It can then be closed and I would ask for a link to the corresponding topic.

Regarding our concern.

We can purchase a nearly 1000 sqm plot and a prefabricated house from the developer.
The construction will take place north of Potsdam.

The plot is currently overgrown with trees and shrubs. Completely so.
Furthermore, there is a shed on the plot.
Around the offered plot there are already single-family houses and bungalows.
Some of them were completed only a few months ago.

If relevant. The plot is 30 meters wide and 33 meters deep.

Now we have some questions.

We would like to know how good the building ground is. (Does this even make sense given the initial conditions?)
Who conducts these surveys and when should they be carried out?
Does this person take care of only the building ground or also other things?

We would like to have a well drilled/built.
Who would we have to hire for this and are there also recommendations on when and how this should be done?

We were informed that with relatively old tree stock it is advisable to cut them all down because the root system can damage water pipes and similar things over the years.
Therefore the question.
Are all trees on the site allowed/can be felled regardless of when and how?
Or must another person/authority be consulted for this?

During the construction phase errors can occur by the workers.
Who do we have to hire so that he supervises during the construction phase that everything proceeds according to our wishes and documents any defects or ensures that these are fixed?

Many thanks in advance for taking the time for our issues.
 

Acof1978

2021-06-23 19:27:49
  • #2


We will be building soon in the south of Potsdam (Fichtenwalde). We are working with Bauherrenhilfe. We have only heard positive things from other builders. And the price of 1% of the house price for 13 appointments is great.
 

11ant

2021-06-23 20:21:45
  • #3
If you buy from the developer, clearing, soil investigation, builder's liability insurance, and so on are their responsibility. Wells are typically protected as existing structures, but newly establishing them is almost hopeless. The county is usually responsible for granting a permit.
 

ypg

2021-06-23 23:02:39
  • #4
As Developer house -> builder of the developer. You buy. And everything concerning the house and land before handover is not your concern or interest. Nor your duty. Quite simple.
 

hampshire

2021-06-23 23:42:06
  • #5
The builder has to deal with the building ground. If you have concerns about soil contamination, ask the "original inhabitants" what used to be there. The well is not an exclusion criterion, right? So irrelevant before purchasing the property. The pipes do not run across the entire property, cutting everything down would be exaggerated if you want to keep a few trees. That is a question of the municipal statutes. The builder takes care of it. The recommendation of the building owners' assistance keeps coming up and many were very satisfied with it. If you are otherwise unsure: go for it. It's not necessarily required.
 

Acof1978

2021-06-24 07:22:09
  • #6
For the well, you should check how deep the usable groundwater is. In Fichtenwalde, you have to drill at least 100m deep. And it's not worth it. Besides, Fichtenwalde is a water protection area.

For trees, you always need an application. Sometimes it's unproblematic, sometimes, as in Fichtenwalde, rather complicated, because there is a local tree protection ordinance.
 

Similar topics
14.08.2012Build a home? Land in prospect19
25.03.2012Land now - house construction next year23
14.01.2014Buy land let build dream house26
13.09.2014Multi-family house: arrangement of residential units, trees, etc.35
18.04.2016Trees on desired plot, is felling allowed? Seeking advice10
16.11.2017No building land due to new EU native model?168
06.08.2019First conversation with the developer - first numbers...64
15.09.2019Developer refuses to hand over documents32
10.12.2019Building ground suddenly a biotope135
09.02.2020Loess Loam & Shell Limestone as Building Ground: Unexpected Expenses / Costs10
02.04.2020Possible building plot - shaft on the property28
03.06.20208 trees on the property between the power and telephone lines.31
06.02.2021The developer requires a down payment to start drawing42
08.12.2021Would you build yourself again or use a developer?31
01.02.2022Who is responsible for the trees? Neighbor's fence behind the boundary10
25.12.2023Behavior in case of imminent delay by the property developer48
14.08.2023Does the builder have to hand over the soil report?18
21.10.2023Land and home financing - together or separately?54
22.07.2024Dividing land for a duplex, how to best sell the second half14
17.09.2024Buy land in Potsdam with huge oaks?20

Oben