But not the client either. If the general contractor received knowledge of the Bedengutachten after the planning and acted independently, it is strange but professionally correct.
Better than a defective building. And if you don't pay, he won't build. And won't build and won't build.
Have a factual conversation with him.
It is different if he submitted the offer with knowledge of the report. Then he miscalculated.
Better than a defective building. And if you don't pay, he won't build. And won't build and won't build.
Have a factual conversation with him.
It is different if he submitted the offer with knowledge of the report. Then he miscalculated.