The work on my little house is coming to an end - unfortunately, last week during continuous heavy rain, the top coat of plaster on a gable facade detached and slipped off in several strips.

Construction: base and top plaster on aerated concrete.
Base plaster: mineral fiber lightweight plaster, top plaster: silicone resin plaster.

The builder wants to record the damaged plaster as a defect during the upcoming house acceptance and to replaster the entire gable wall next spring (remove top plaster).

How high should my retention (reduction of the corresponding installment) be?

The installment for plastering (top and base plaster) is 7,000 EUR.
Replastering is required for the ground floor and roof gable (one front).
Gross area approx. 50 sqm, 4 windows + 1 door.

What is appropriate as retention? 2,000 EUR? less?
I would be grateful for an estimate.

Regards,
Dee
 

Wastl

2012-12-05 14:08:33
  • #2
We have withheld €2,000 (Material ist schon da) for 1/3 of the wall area, approximately 90 sqm.
 

Boergi

2012-12-05 14:14:59
  • #3
Do you have a contract according to [VOB]? You can set the double costs for the removal of the defects. I would calculate the total amount/m² to the damaged m² plus the costs for removing the existing plaster and multiply the whole by two. Regards, Sebastian
 

Dee

2012-12-05 14:17:47
  • #4


No, Building Code.
Can I also charge double costs there?

Regards
Dee
 

Dee

2012-12-11 19:18:31
  • #5
Yes - § 641 Building Code! Regards Dee :-)
 

Similar topics
12.03.2013What is the maximum rate for a net salary of 3,000 euros?24
02.10.2014Plastering the interior in a new building or applying painter's fleece directly?11
15.06.2015New construction: Plaster the concrete ceiling on the ground floor18
22.07.2015Young family wants to buy a house, but does the installment fit?15
11.08.2015What can I realistically afford as a rate?51
14.12.2015Does my rate match the salary?38
03.05.2016Please evaluate the payment plan25
07.07.2019Painter's fleece or plastering in new construction - experiences?27
14.04.2020Security deposit according to §650 of the Building Code20
08.07.2020Retention 5% Security Payment GU Construction Contract18
27.05.2021Plaster the underside of the carport26
09.03.2021Withholding payment for defects in the shell construction74
11.03.2021Tiles first or plaster first12
26.05.2021Which topcoat is best suited for smoothing?11
10.09.2021Plaster Q2 walls with roll plaster or other recommendation?27
04.08.2022Lay the floor before plastering / Cover properly25
02.10.2022Retention after house acceptance - is substitute performance possible?11
31.07.2023Children's room: prefer wallpapering or plastering?23
09.11.2023Concrete light shaft corner broken in shell construction - retention justified?14
29.02.2024Payment plan - 5% retention not regulated11

Oben