Hello,
to compensate for the slope, three rows of shuttering blocks were placed on the strip foundation, but without incorporating steel. The floor slab is then to be placed on this.
Do you consider this to be problematic?
to compensate for the slope, three rows of shuttering blocks were placed on the strip foundation, but without incorporating steel. The floor slab is then to be placed on this.