Hello everyone,
we will be building deep inland and still need to cover about 25m through the garden to the construction site. I want to properly pave the 25m only after completing the construction work because I’m afraid that the heavy construction machines will damage the new pavement.
How can I reinforce the garden in a cost-effective way so that the excavator and truck (I’m building a timber frame without a basement – so only excavation for the floor slab) do not sink into the ground, and I don’t go broke doing it?
Regards
Bodo
we will be building deep inland and still need to cover about 25m through the garden to the construction site. I want to properly pave the 25m only after completing the construction work because I’m afraid that the heavy construction machines will damage the new pavement.
How can I reinforce the garden in a cost-effective way so that the excavator and truck (I’m building a timber frame without a basement – so only excavation for the floor slab) do not sink into the ground, and I don’t go broke doing it?
Regards
Bodo