L'Ormeau
2021-08-07 17:08:10
- #1
Regarding the expansion, it will still take 4-5 years, it simply doesn't make sense before then because the plan is not finalized yet, in the end you would tear up a good piece of paving again...
Similar topics | ||
22.06.2016 | Substructure for terrace | 15 |
28.11.2018 | Pave a 100m² driveway | 49 |
31.08.2017 | Pave inclined surface | 12 |
10.04.2019 | Paving up to the door - how to finish? | 15 |
20.02.2020 | Paving and Drainage DIY | 14 |
25.02.2021 | Pave the driveway, carport later - procedure? | 24 |
27.02.2021 | Costs for paving the driveway | 21 |
11.01.2023 | Paving the terrace for a new construction of a "low-built" single-family house | 18 |