Hello forum,
we are planning the utility connections. Our property is a rear plot with about 30m access path that belongs to us. We are aware of the higher costs resulting from this. Upon request, we were informed that the sewage and drinking water pipes end after about 1m on the property in a shaft. The remaining meters are up to us. Does anyone have experience with this? Can this be done in EL or who should be commissioned for this?
We would be very grateful for a few tips.

Best regards
Jeannette
 

hampshire

2021-07-02 21:44:12
  • #2
We first laid the pipes and lines for the supply up to a transfer point at the edge of the property, then the utilities came and connected them. With some effort, all could be laid in such a way that the street only had to be torn up once,
 

Bärchen2012

2021-07-02 21:52:05
  • #3
Did you get the pipes yourselves and lay them, or did you have it done?
 

hampshire

2021-07-02 21:59:27
  • #4
We have commissioned the civil engineer with the earthworks and concrete works. Doing it ourselves on our property was too complex and tool-intensive for us, with over 10m height difference up to the handover point and partly soil class 7.
 

Bärchen2012

2021-07-02 22:05:17
  • #5
It is not that bad for us, but we will have the professionals do it. Thank you very much for now
 

motorradsilke

2021-07-03 04:29:29
  • #6
We did that ourselves at least for the wastewater many years ago. We also had about 35 m. However, the soil here is unproblematic, Märkischer Sand. It is a question of money and fitness. Wastewater must be laid quite deep, depending on where the transfer to the main pipe is. For us about 1.30 m deep. There are also mini excavators to rent.
 

Similar topics
17.04.2016Value of land and bungalow B5511
08.11.2010Offer for a semi-detached house with land, okay?11
07.07.2011Financing land now, house in 6 months?17
14.08.2012Build a home? Land in prospect19
25.03.2012Land now - house construction next year23
31.05.2012Financing of the property: Does the entire financing need to be secured?11
04.09.2012Land paid - Building with an additional loan?16
02.09.2013Angular bungalow on 800m² plot - financially feasible?16
09.02.2013What do you think of this property?11
28.05.2013I am getting a plot of land as a gift. How do I finance the construction?16
05.04.2015Property reserved. Financing is pending52
16.12.2015Sewage costs - I am somewhat stunned15
31.07.2019Filling and compacting the ground for the house155
31.07.2018House connection costs for wastewater. Included in the ancillary construction costs with 3.5K.13
15.05.2019Are the house connections already one meter on the property?16
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
15.01.2021Development costs for a plot in the second row35
05.06.2021New building connection costs, especially wastewater17
11.01.2023Paving the terrace for a new construction of a "low-built" single-family house18
12.02.2025Suitable slope for wastewater14

Oben