I am in the process of building a house in the Munich area and would like to compare a few individual prices
In addition, there is a whole position in the offer titled "Equipment and material costs" where, for example,
mini excavator 10 hrs, crawler loader 10 hrs, etc. are listed. Is that normal?
I would appreciate feedback on whether these figures are within a normal range.
Regards
Alexander
I am in the process of building a house in the Munich area and would like to compare a few individual prices
[*]Exterior masonry (Poroton), 1.4/12 d=24.0 => 139.10 EUR per m2
[*]Basement exterior wall. Concrete, d=24 cm, with formwork => 148.10 EUR per m2 (the reinforcing steel was offered separately in a separate position)
[*]Reinforced concrete ceiling, d=20 cm => 84.70 EUR per m2
In addition, there is a whole position in the offer titled "Equipment and material costs" where, for example,
mini excavator 10 hrs, crawler loader 10 hrs, etc. are listed. Is that normal?
I would appreciate feedback on whether these figures are within a normal range.
Regards
Alexander