Second option (core drilling), which is also a bit more expensive (about €150?), I personally find cleaner. But the first option is to fix the pipe in place first and then brick around it. The question is, if you do it that way, whether you can later attach backflow flaps or [Rostgitter]?
 

Knallkörper

2018-06-30 23:43:32
  • #2
Why shouldn't that be possible?
 

zizzi

2018-07-01 23:28:44
  • #3
For me, what the kitchen person said also sounds illogical. So far, we have decided on a different kitchen builder. He said both variants are possible, but with the second one you save about 200 €. That’s why I got a suitable pipe for it (telescopic pipe with a 162 mm diameter). Will a 150 one fit afterwards. My despair remains whether there will be enough space afterwards between the roof of the equipment room (behind the kitchen wall) and the roof overhang (bungalow)!
 

Similar topics
09.08.2015Problem with connection of washbasin to drainage pipe16
15.10.2017Heating of the supply air in the pipe16
28.05.2019Condensation and mold on the supply air duct - What to do?11
28.06.2019Guest WC: Lower the ceiling or cover the pipe?16
06.10.2023Unknown pipe in the garden and concrete cover10

Oben