We are still at the shell construction stage. We have now reached the masonry work on the 1st floor. Therefore, two questions from me on the topic:

1. Is night frost an obstacle for masons?
2. Is the reinforced concrete ceiling (partially finished, partially cast on site) also at risk during night frost?

Thank you very much!
 

Orschel

2011-11-14 10:26:37
  • #2


Thanks again for the answer. By the way, we were really lucky in this regard, the weather was great. The floor slab was poured during the time when we had about 15 degrees during the day and it did not get colder than 5 degrees at night; there was also light rain once in the morning. I think we couldn’t have wished for much better conditions for the floor slab in November! Otherwise, the basement is now more or less finished and tomorrow the basement ceiling will be put on!

Stromberg would say: Going great!
 

Häuslebauer2012

2011-11-14 14:18:04
  • #3
So, last week we had our foundation slab poured and the next day the bricklayers immediately started with the exterior masonry. According to our master bricklayer, temperatures down to 0 degrees are not a problem.
 

Bauexperte

2011-11-14 20:45:27
  • #4
Hello,


As long as he also assumes responsibility for it, this statement is perfect

Kind regards
 

Similar topics
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
21.11.2013Is the floor slab still possible this year?15
23.11.2014Stone throw on foundation slab - builder's liability insurance?16
07.09.2015Minimum distance from the base plate?11
11.09.2016Base plate - construction/insulation etc. - experiences please!10
05.08.2016Leave the floor slab over winter15
20.08.2016Base slab vs strip foundation15
13.09.2016Insulation under the floor slab EPS or XPS?12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
06.10.2016Base plate with defects?22
27.11.2016Double insulation below and above the floor slab?10
17.05.2017Combustion air supply / chimney stove - thermal air draft or base plate17
28.06.2017Basement costs - Is the floor slab offset?17
18.08.2017Base plate ready - construction supervisor absent20
18.08.2017First invoice for earthworks and base slab due25
21.10.2017Sealing the base slab before the roof is installed19
06.10.2019Base plate with concrete core activation. What is your opinion?46
14.03.2018Slight slope, building with a basement or a floor slab?16