Hey,
the screed has been in place for 1.5 weeks. Unless anything changes, the heat pump is supposed to come in week 15. Now the area under the heat pump should also be tiled. My construction manager said that with a diffusion-open adhesive, the tiles could be laid there. What do you think?
And if yes, then only in the area of the heat pump or should the HAR and the adjacent storage room be tiled as well?
Thanks!
By the way, what tile sizes do you have in the HAR? Maybe even some pictures?