Hello everyone, I heard from an acquaintance that with Schwörerhaus there is always a "seam" visible between two floors. Can anyone confirm this? If yes, where does it come from?
 

Mottenhausen

2018-07-27 22:31:57
  • #2
Some prefabricated houses are already machine-plastered in the factory. That means wherever the house is assembled, a joint remains. This joint is either plastered and painted on-site or sealed with a filler - [Kompriband].
 

Fuchur

2018-07-28 02:18:55
  • #3
Yes, I can confirm with the seam. My parents have a Schwörer house and exactly this "overlap". I don't really understand the purpose behind it. When asked, Schwörer house said it was about the tightness regarding running water. I can't fully comprehend that argument.
 

tomtom79

2018-07-28 08:46:13
  • #4
Yes, every Schwörer house has the seam, it depends on the plastering done at the factory. It just reduces the construction time on site.

There are 4-5 different variants of how one wants the seam to look. We chose the edge, my sister chose the clinker bricks 20 years ago. And I think the plaster looks visually flatter in raking light than that of the neighbors.

PS Schwörer house still has a few peculiarities that extremely reduce the construction time. For example, screed including underfloor heating delivered as a prefabricated part. So no screed drying.
 

HilfeHilfe

2018-07-28 09:40:30
  • #5
If you want it fast, you get it fast. We have a solid house and cracks were repaired. Everything was made worse. In 15 years new plaster and peace.
 

Mariachi1101

2018-07-28 22:41:15
  • #6
Thank you all!
This is a deal-breaker for me.
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
13.03.2015Smart home automation at Schwörerhaus12
18.03.2015Developer information varies. What is the realistic construction time?19
10.05.2015Screed uneven - defect removal refused52
16.02.2016Dismantling - Transport - Assembly of a Prefabricated House15
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
02.06.2016Necessary insurances during construction and afterwards11
19.08.2017Technical room before installing screed: should the technology be painted now or later?16
24.01.2018Is the floor still too wet or is it already normal?27
19.03.2020Lime-gypsum plaster crumbly and therefore defective?21
04.05.2020Can Q2 plaster be wallpapered with fleece wallpaper?16
05.07.2020Is sanding Q2 plaster yourself an option?15
12.10.2020Q2 Plaster cracks / minor defects - is this a defect or tolerable?17
16.10.2022Stains on the plaster and visible joints15
03.03.2023Wallpaper or plaster? Which is better in new construction?96
19.07.2023The plaster has detached while knocking the grooves...16
29.01.2025Is Schwörerhaus a premium provider compared to Streif Haus?22

Oben