Of course, I will ask about that. I thought you knew, then I would have saved myself the trip.
 

sven.conzi

2017-10-14 18:59:13
  • #2
We use the Leda Luc 2 as an underpressure monitor. We get it from the chimney fitter. The bus cable is provided by the chimney fitter to the electrician beforehand, so everything can be prepared. No one has any problems with it. They have done it this way several times already. It is a construction by the architect and finally the general contractor is recommended/sought by the architect. The chimney fitter was recommended by the architect, although he was actually the most competent of the three we visited.
 

frank_gayer

2017-10-14 19:29:19
  • #3
That may be true when building a solid house, but with prefabricated houses with a turnkey construction, you have no direct contact with any trade.
 

berny

2017-10-15 16:18:44
  • #4
Hello Frank, found it:
 

frank_gayer

2017-10-15 16:24:26
  • #5
Great, so only two-core? I'll have a five-core installed.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
20.08.2016Should the house be planned by a general contractor or architects?30
10.03.2017Payment of the architect16
12.10.2017Cost of enclosed space. First draft discussed with architects27
27.10.2017Construction description by architects: Who has experience?13
07.02.2018Architect's suggestions disappointing - What next?32
16.02.2018Stress with the architect - naively signed the preliminary contract17